Industrial Automation
Context: MWSC apprenticeship
Status: Workshop preparation completed and system installed on site with the team
Context
My work brings the electrical documentation, the Beckhoff PLC configuration and the plant setup in Dorner Batch into line. I prepare some configurations independently, from identifying field signals and assigning them to the PLC modules through to configuring the equipment in the batching software. The workshop checks help the team identify configuration issues before going to site.
Objective
Maintain a coherent mapping from electrical documentation to PLC signals and Dorner Batch plant configuration.
My role
I/O mapping and plant configuration.
Technologies
Beckhoff
TwinCAT
Dorner Batch
I/O mapping
Electrical schematics
System configuration
My contribution
- I use the plant drawings and available photos to build an Excel list of inputs and outputs.
- I work out the Beckhoff hardware the plant needs and map the signals to the cards. I then configure the corresponding equipment in Dorner Batch.
- When the hardware arrives, I assemble and check it at the office. The aim is to resolve configuration issues before the team goes to site.
Approach and technical considerations
- Follow each signal from its electrical reference to its PLC assignment and functional equipment representation.
- Check the relationships between configuration objects rather than treating each list as an isolated document.
Work carried out
- I/O lists prepared and adapted for several concrete batching plant projects.
- Beckhoff assignments and Dorner Batch configurations prepared and adjusted.
Observed results
- I/O lists and configurations were prepared and adjusted for several plant projects.
- I helped the team install the Beckhoff system at the concrete batching plant and make the final adjustments on site.
Limits of this work
- Prepared and adjusted configurations do not establish the commissioning status of each plant.